Bookkeeping for a Maryland construction company means coding every cost to a job and cost code, billing progress draws and tracking retainage, paying 6 percent sales tax on materials, filing certified payroll on prevailing wage work, collecting lien waivers and W-9s from subs, and closing the books monthly so the WIP schedule rests on numbers you can trust.
That is a different job from bookkeeping for a retailer or a services firm. A contractor with ten open jobs is keeping ten sets of books inside one company, and the general ledger only tells the truth if every transaction lands on the right job. This guide walks through what that work looks like week to week, the Maryland rules that change it, and how to tell when a bookkeeper alone is no longer enough.
Why is construction bookkeeping different from regular bookkeeping?
In most businesses, a sale happens and the revenue is recorded. In construction, revenue is earned over months, billed in draws, and partly held back as retainage. Costs arrive from crews, suppliers, subcontractors and equipment, often weeks after the work was done.
So the bookkeeper has two jobs at once. The first is the normal one: record transactions, pay bills, run payroll, reconcile accounts. The second is construction specific: make sure every dollar is tied to a job and a phase, so project managers and owners can see which jobs make money and which ones quietly lose it.
When that second job is skipped, the company P&L can look fine while two or three jobs are underwater. Our guide to CFO services for Maryland construction contractors covers what happens next at the WIP and bonding level. This article stays with the bookkeeping underneath it.
What does a construction bookkeeper do each week and month?
A workable rhythm for a growing contractor looks like this:
Every week
- Code supplier invoices and subcontractor bills to the correct job and cost code before they are approved for payment.
- Match field timesheets to jobs and run payroll, including any certified payroll reports that are due.
- Log change orders as they are approved, so contract values and budgets stay current.
- Collect conditional and unconditional lien waivers with each subcontractor payment.
- Track open receivables by job, including retainage held by each customer.
Every month
- Prepare progress billings (pay applications) from the schedule of values and the work completed to date.
- Reconcile every bank, credit card, loan and line of credit account.
- Post accruals for costs incurred but not yet billed by suppliers or subs.
- Produce job cost reports comparing budget, cost to date and estimated cost to complete.
- Hand clean job cost data to whoever prepares the WIP schedule and the monthly financial package.
The order matters. Pay applications and WIP depend on job costs, and job costs depend on coding done in the week the bill arrives, not at month end.
How should job costing be set up?
Job costing is the backbone. Without it, nothing else in construction accounting works. A sound setup has three parts.
- A job list that matches real contracts. One job per contract, with change orders tracked under it rather than as new jobs.
- A short, consistent cost code list. Labor, materials, subcontractors, equipment and other direct costs at minimum, broken into phases that match how you estimate. If estimating and accounting use different codes, budget versus actual reports are useless.
- A rule that nothing is approved without a job and code. Bills that sit in an "uncategorized" or overhead bucket are where job margins disappear.
Labor is usually the hardest piece. Crews move between jobs during the week, and burden (payroll taxes, workers' comp, benefits) has to follow the hours to each job, or labor costs will be understated on every project.
What Maryland tax rules affect contractor bookkeeping?
A few state rules change how a Maryland contractor's books are kept. This is a summary, not tax advice; confirm your situation with a CPA.
Sales and use tax on materials
The Comptroller of Maryland's Business Tax Tip No. 18 says real property contractors must pay the 6 percent sales tax on building materials and supplies, and that labor to install, erect, assemble or repair real property is not taxable. Materials bought out of state and brought into Maryland for use here are also taxable, which means use tax may be owed when a vendor did not charge Maryland tax.
For the bookkeeper, that means sales tax paid on materials is a job cost, not something billed to the customer as a separate tax line on real property work. It also means out of state purchases need to be reviewed for use tax each month. The same tip covers when exemption and resale certificates apply, and the limits on using them, so keep the certificates you rely on in the job file.
Prevailing wage and certified payroll
On public work, payroll gets more demanding. The Maryland Department of Labor's Prevailing Wage Unit covers state and local construction contracts valued at $250,000 or more with 25 percent or more state funding, and contractors and subcontractors register in its online portal to submit certified payroll reports. Federally funded jobs can carry the federal Davis-Bacon requirements as well, so check each contract.
The bookkeeping impact: workers need to be classified correctly, rates by classification have to be set up in payroll, and certified reports have to tie back to the payroll actually run. If you also chase government work, our article on CFO services for Maryland government contractors covers the compliance side.
Subcontractor paperwork and 1099s
Collect a W-9 and a current certificate of insurance before a subcontractor's first payment, and track lien waivers with every payment after that. At year end, payments to unincorporated subs are reported on IRS Form 1099-NEC. Chasing W-9s in January is a sign this step is being skipped during the year.
How do progress billing and retainage show up in the books?
Most commercial work is billed in monthly draws against a schedule of values. Each pay application shows the contract amount, approved change orders, work completed to date, retainage held and the amount due this period. The bookkeeper should be able to rebuild every pay app from the job cost records.
Retainage needs its own receivable account (and its own payable account for retainage you hold from subs). If it is lumped into regular receivables, aging reports look worse than they are and nobody notices when retainage on a finished job is overdue. Maryland has rules on retainage for some private contracts; ask your attorney what applies to yours.
| Item | Where it belongs | Common mistake |
|---|---|---|
| Progress billing | Contract revenue, by job | Billing from estimates instead of the schedule of values |
| Retainage receivable | Separate asset account, by customer and job | Mixed into accounts receivable and forgotten |
| Retainage payable | Separate liability account, by sub and job | Paid early, or never tracked |
| Sales tax on materials | Job cost (materials) | Booked to overhead, so job margins look better than they are |
| Labor burden | Job cost, allocated with hours | Left in overhead |
When does a contractor need more than a bookkeeper?
A good construction bookkeeper keeps records clean and current. Somewhere between a few million and ten or more million in revenue, most contractors also need someone who reviews those records, builds the WIP schedule, and answers to the surety and the bank. The work splits roughly like this:
| Role | Owns |
|---|---|
| Bookkeeper | Coding, AP, AR, payroll, pay apps, reconciliations, lien waivers |
| Controller | Month-end close review, accruals, job cost review, WIP schedule, internal controls |
| CFO | Cash forecasting, bonding capacity, lender and surety relationships, bid strategy, pricing |
Signs you have outgrown bookkeeping alone: monthly financials arrive more than three weeks after month end, the WIP schedule is built once a year for the surety, job margins at close look nothing like the estimate, or the owner is the only person who knows which jobs are profitable. Our checklist of signs your business has outgrown its bookkeeper goes deeper.
What does outsourced construction bookkeeping look like?
For a contractor without a full accounting department, an outsourced team can cover the bookkeeping, controller and CFO layers together instead of hiring three people. At Catapult, bookkeeping and managed accounting starts with rebuilding the chart of accounts around how you actually make money, connecting payroll, AP and billing to QuickBooks Online, and running a documented monthly close with reconciliations and a second reviewer. For contractors, that means job and cost code discipline from day one, and a reporting package that includes job cost results alongside the P&L, balance sheet and cash flow.
The goal is simple: financials you can bid, bond and borrow on, delivered on a date you can plan around.
Frequently Asked Questions
Can a regular bookkeeper handle a construction company?
A regular bookkeeper can handle the basics, but construction adds job costing, cost codes, progress billing, retainage, certified payroll and lien waivers. Someone without that background often books costs to overhead instead of jobs, which hides losing projects. Ask any candidate how they set up cost codes and track retainage before you hire them.
What accounting software do construction companies in Maryland use?
Smaller contractors often run QuickBooks Online with job and class tracking, sometimes paired with a construction add-on for pay applications and project management. Larger contractors may move to construction specific accounting systems. The right choice depends on job volume, payroll complexity and whether you do prevailing wage work, so map your process first and pick software second.
Do Maryland contractors charge sales tax to their customers?
For real property work, the Comptroller of Maryland says contractors pay the 6 percent sales tax when they buy building materials, and labor to install or repair real property is not taxable. Selling materials as personal property, without installing them, is treated differently. Confirm how your jobs should be handled with a Maryland CPA.
How often should a contractor close the books?
Monthly. Pay applications, the WIP schedule, surety reporting and bank covenants all depend on current job costs, and a quarterly or annual close leaves you finding job overruns after the work is done. A good target for a mid-sized contractor is financials and job cost reports within about two weeks of month end.
Next Step
Catapult Advisory Group handles bookkeeping, controller support and CFO services for growing companies from our Annapolis office, serving contractors across Baltimore, Annapolis and the DC metro. If your job costs or WIP schedule are hard to trust, call 443.223.7849 or book a free assessment and we will walk through where your books stand.
Want a second opinion on your finance function?
Book a free assessment and we will show you exactly where your accounting operations are costing you time, cash and clarity.
Book a Free Assessment